فا
 

Asphalt pavement of first zone of Tehran city

Asphalt pavement of first zone of Tehran city

  • Category:Road & Airfield construction
  • Client:Engineering & Development Organization of the City of Tehran
  • Consultant:Ettehadrah Consulting Engineers
  • Location:Tehran
  • Starting Date:07.2008
  • Initial Price:4.750.000 $
  • Progress:100%
  • Completion Date:07.2010
  • Asphalt pavement of first zone of Tehran city

Implementing the asphaltic operation which includes preparation, transportation, patching, geotextile installation, sealing and asphalt scraping on the surface of avenues and highways within the zone number one of Tehran city (Inclusive of 1,3,4) consisting:
a) Geometric patching in a mechanized form: This process includes the geometric patching in a mechanized form in the zone subject to the contract due to scraping, digging and destruction in the various widths and the required thickness (at least 5 centimeters). This will be undertaken by the specialized asphalt scraping machines. The edges of scraped surfaces asphalt will be destroyed by a compressor and the destroyed material will be collected, loaded, transported and dumped in determined places by the employer. Cleaning, sweeping and ventilating the scraped place will be conducted with the help of a compressor. The destroyed surfaces and the floor will be tuned up and then the bitumen will be applied by a spray bar in one or more layers (maximum layer thickness is 7 centimeters). At the end the finisher will be applied and compression of the spread asphalt is conducted by iron and rubber rollers.
b) Asphalt scraping operation: General asphalt scraping at the avenues and highways within the zone number one in the approximate amount of 80.000 square meters and by the asphalt scraper machine 2000 DC, 1000 DC.
c) Spreading and pummeling various types of asphalt as a cover on the patching and scraped surface
d) Geotextile installation: Geotextile installation and implementing the manual bitumen spray in the required places such as the avenues and highways asphalt surfaces within the zone that is subject to the contract
e)Sealing: Asphalt cracks sealing in the width of 1.5 up to 2 centimeters and in the minimum depth of 2 centimeters inclusively grooving, cleaning the gaps with a compressor and healing the groove place by using warm air and injecting the special, polymeric bitumen for sealing.

Where you can buy Louis Vuitton Replica :

Fake Louis Vuitton Belt Louis Vuitton Artsy Replica Louis Vuitton Messenger Replica Louis Vuitton Keepall Replica Borse False Louis Vuitton Napoli Portafoglio Louis Vuitton Imitazioni Louis Vuitton Replica Kaufen Replique Sac Hermes Replique Sac Ysl Cheap Hermes Bags From China Dior Tasche Replica Sac Hermes Pas Cher Gucci Replica 1:1 Fake Dior Saddle Bag Cartier Love Ring Replica Cartier Love Bracelet Replica 1:1 Bvlgari B.Zero1 Replica Louis Vuitton Imitazioni Van Cleef Replica Louis Vuitton Wallet Replica fake louis vuitton messenger Cartier Love Imitazione Louis Vuitton Backpack Replica real gold cartier love bracelet replica Juste Un Clou Replica canada goose replica Portafoglio Louis Vuitton Imitazioni Replica Goyard Cartier Juste Un Clou Replica fake louis vuitton backpack Van Cleef Replica fendi peekaboo replica Replica Chanel Fake Louis Vuitton Chanel Bag Replica louis vuitton replica Replica Louis Vuitton Tasche Borse Louis Vuitton Replica Louis Vuitton Replica Fake Louis Vuitton Fake Louis Vuitton Bags Fake Louis Vuitton Fake Louis Vuitton Bags Replica Louis Vuitton Bags Louis Vuitton Replica Louis Vuitton Replica Fake Louis Vuitton Bags Replica Louis Vuitton Bags Louis Vuitton Replica Fake Louis Vuitton